Walkthrough checklist
Expected outcomes and where to verify them as you follow the workshop.
Before the first Azure run
Record outcomes, elapsed time, region, tool versions and fixes as you follow the published chapters.
Run the software checks, confirm access to the selected subscription and review the cost estimate. Run the quota checks when a chapter first needs that service.
Core acceptance observations
| App or step | Expected outcome | Where to verify |
|---|---|---|
| Products | Ready Pod, applied Flyway migration, signed-in upload and matching blob path | Test the upload |
| ProductsEmbedder | Function trace reports chunks and the new Cedar manual is ready | Find the indexing result |
| ProductsChat | Cedar answer cites the timer passage and the worker logs its request ID | Test the reply |
| Full chain | A fresh upload produces the expected Aurora temperature evidence | Verify upload to answer |
| Cleanup | Workshop group and managed AKS node group are gone | Confirm cleanup |
Check the Bicep templates locally
Save the templates linked in the Products and ProductsEmbedder chapters in ai200-lab. az bicep build compiles each file locally to check syntax and types. --stdout sends the compiled template to the shell, where this check discards it.
az bicep build --file foundation.bicep --stdout | Out-Null
az bicep build --file database.bicep --stdout | Out-Null
az bicep build --file compute.bicep --stdout | Out-Null
az bicep build --file products.bicep --stdout | Out-Null
az bicep build --file models.bicep --stdout | Out-Null
az bicep build --file embedder.bicep --stdout | Out-Null
az bicep build --file foundation.bicep --stdout > /dev/null
az bicep build --file database.bicep --stdout > /dev/null
az bicep build --file compute.bicep --stdout > /dev/null
az bicep build --file products.bicep --stdout > /dev/null
az bicep build --file models.bicep --stdout > /dev/null
az bicep build --file embedder.bicep --stdout > /dev/null
See the validation report for the software checks and what still needs a live Azure run.
Record what actually happened
Record the results you observed and any issues that blocked a step. If the workshop takes longer than 3½ hours after setup, note which chapters took the extra time.